Study of the steady-state performance of the Lianco-Cunco-Melipueco distribution line
April 1999 - June 1999
Funding entity Elecnor
The aim of this work is the study of the steady-state performance of a distribution line at 28 kV in Chile (Lianco-Cunco-Melipueco) after incorporating a 3000 kW hydro power plant (El Manzano).